Mechanical and Fabrication

New Dock 14 Demolition & Tie-Ins Expansion

Markets

Terminals and Midstream

Project Status

Complete
IMTT Dock Tie-in

Project Description

EXCEL's contracted scope in the construction of IMTT's dock expansion on the Mississippi River included all mechanical work spanning from the tank farm to the new dock and link-ups to existing docks. In addition, the company handled existing pipe demolition and fabricated and installed pipe spools and straight-run piping, totaling over 13,000 linear feet. Other mechanical work on the expansion included 36,000 linear inches of weld and almost 800 different flanged, threaded, and valve connections. Much of the project was performed on the 600-foot-long dock over the river as bitterly cold winds blew in the winter and record-level flood waters rose in the summer. The project was completed on schedule and with zero OSHA recordable incidents.

Get Started

Consult with an expert. Get a customized plan and budgetary estimate.

Want to stay up to date? Sign up to receive project updates and company news in your inbox.

We care about the protection of your data. Read our Privacy Policy.