Cameron LNG

EXCEL provided E&I installation for Cameron LNG's Train 3. The project included 588,531 man-hours to install 34.5kv, 15kv, 5kv, 480v and UPS power distribution, instrument DCS and control systems, instrument and device installation and check-out. 

Location

Hackberry, LA

Contract Value

$32 Million

Duration

10 Months

Project Scope

The mega site is located on a narrow strip of land in Hackberry, LA.  The limited real estate called for special logistics to overcome traffic, parking, housing, craft transportation as well as material and equipment laydown. Once all three trains of this mega liquefaction-export project came online 12 million tons of LNG per annum or approximately 1.7 billion cubic feet per day began to ship. The project was completed to the satisfaction of owner, accident and incident free. 

Markets

LNG

Project Status

Complete

Project Description

In May of 2018 CCJV awarded EXCEL a $32m contract to provide E&I installation for Cameron LNG’s Train 3.  Once all three trains of this mega liquefaction-export project came online 12 million tonnes of LNG per annum or approximately 1.7 billion cubic feet per day began to ship.   The mega site is located on a narrow strip of land in Hackberry, LA.  The limited real estate called for special logistics to overcome traffic, parking, housing, craft transportation as well as material and equipment laydown.  The project was completed to the satisfaction of owner, accident and incident free.  The project included 588,531 man-hours to install 34.5kv, 15kv, 5kv, 480v and UPS power distribution, instrument DCS and control systems, instrument and device installation and check-out. 

Quantity Installation Summary

209,000 Raceway
2,400,000 Cable
105,000 Terminations
2,879  Device Mounts
8,150 I/O Point-to-Point + Functional Checks

Other Electrical & Instrumentation Projects

P66 Borger
Complete

Oil and Gas

P66 Borger

The expansion of the P66 Borger Refinery was designed to boost the facility's processing capabilities by incorporating new crude heaters and related infrastructure. EXCEL Group was contracted to carry out the Electrical and Instrumentation (E&I) tasks, which included installing critical systems to support the new equipment.

Electrical & Instrumentation

View Project

Complete

Oil and Gas

P66 Bayou & GRP

The P66 Lake Charles "Project Bayou GRE" was a substantial specialty electrical and instrumentation project that involved construction on four units simultaneously, all of which were live and operating, showcasing the team's capability to work in highly sensitive environments.

Electrical & Instrumentation

View Project

Dow Samsung Chlorine Project
Eagle Award
Complete

Chemical / Petrochemical

DOW-SAMSUNG Chlorine #7 Falcon Project

As a specialty electrical and instrumentation contractor for the Dow-Samsung Chlorine #7 Project Falcon, the largest industrial project at the time.

Electrical & Instrumentation

View Project

Complete

Oil and Gas

Marathon Turnaround

Excel Provided Electrical & Instrumentation Services

Electrical & Instrumentation

View Project

Orascom Methanol Plant
Complete

Chemical / Petrochemical

Orascom Methanol Plant

EXCEL completed the E&I construction for the world-class Methanol Plant owned by Natgasoline

Electrical & Instrumentation

View Project

fccu block turnaround
Complete

Oil and Gas

Hovensa Oil Refinery FCCU Block Turnaround

EXCEL was the general contractor for all electrical and instrumentation work for the Hovensa Oil Refinery

Electrical & Instrumentation, Turnarounds

View Project

Get Started

Consult with an expert. Get a customized plan and budgetary estimate.

Want to stay up to date? Sign up to receive project updates and company news in your inbox.

We care about the protection of your data. Read our Privacy Policy.